Project Partnerships FP Mine Location: Geita Region Plant Type: Carbon in Leach Plant Project Scope: Milling, CIL, Elution and TSF Grade: 1.3 g/tThroughput: 800 tpdFMS set out to process tailings derived from predominantly historic vat leached waste and colonial mine tailings hauled in from within the Geita district. FMS were responsible for the design, build and management of the mine. Phoenix Mine Location: TanzaniaPlant Type: Pilot plant, crushing, milling & carbon in leach plantProject Scope: Mining, Tailings, process plant, TSFGrade: 2 g/tThroughput: 24 tpdFMS owned a number of primary mining licences in the Musoma district. The site consisted of 60,000 tonnes of colonial tailings and an old mine down to three level. FMS installed a 24 tpd pilot to process a blend of high grade ore from the mine mixed with tailings. Tulawaka & Buhemba Mine FMS started a venture with the Tanzanian State Mining Company to explore the options of re-processing two large tailings sites within Tanzania. Previously the mines belonged to African Barrick Gold and and Meremeta Ltd.